SERVICE · GENERATOR SET MAINTENANCE

Your generator, ready for the next outage

A standby generator sits idle for months and must start within seconds, right when the grid goes down. We provide preventive and corrective maintenance with a tiered protocol, load testing and a technical report after every visit, so the backup power of your building, clinic or company does not fail when you need it most. And we go further: we service and adjust the transfer switch and, when a failure keeps coming back, we find its root cause.

  • Preventive and corrective
  • Transfer switches (ATS)
  • Root cause analysis
  • Load testing
  • Report after every visit
  • All brands
60.0 Hz 220 V · 75% DIESEL PREVENTIVE MAINTENANCE Oil and filtersBatteries 27.4 VCoolantTransfer switch test Next service 250 h Ready to run
3maintenance levels: monthly, preventive and annual
28tasks checked in the full protocol
6systems checked: engine, fuel, cooling, starting, generator and control
1technical report with photos and readings per visit
WHY GENERATORS FAIL

They almost always fail at start-up, and it was almost always avoidable

Most standby generator failures are not in the engine itself but in everything around it. These are the points good maintenance checks before you find out during a blackout.

Dead batteries

The number one cause of “won’t start”. A failed charger or an old battery leaves the generator silent.

Water or sludge in the fuel

Stored diesel degrades and clogs filters and injectors right when the generator picks up load.

Overheating

Old coolant, a dirty radiator or cracked hoses shut the generator down on high temperature.

Wet stacking from no-load runs

If the generator only ever runs unloaded, the engine builds up soot and unburned fuel.

Transfer switch does not operate

The generator starts, but the transfer switch does not pick up the load or return to the grid.

Ignored alarms

Controller warnings pile up until they become a shutdown in the middle of the emergency.

WHO IT IS FOR

Organizations that cannot afford to lose power

Residential and office buildings

Elevators, water pumps, intercoms, cameras and common areas. A clear report for the property manager and board.

Clinics and hospitals

Critical equipment and cold chain. Equipment history and maintenance records for audits.

Public institutions

Town halls, government offices, schools and universities.

Retail and hotels

Supermarkets, malls, hotels and restaurants: sales, refrigeration and security.

Industry and agribusiness

Process plants, warehouses, mills and cold storage where downtime costs money.

Telecom and data

Towers, nodes and server rooms that must stay online.

Oil, mining and construction

Camps, well sites and job sites running prime-power generators.

Water utilities and pumping

Pumping stations and treatment plants that supply the community.

MAINTENANCE PLANS

Three levels that build on each other

Each level includes everything in the previous one. Frequencies are adjusted to how the generator is used (standby, prime or continuous), its running hours and the manufacturer’s manual.

LEVEL 1

Operational inspection

Monthly

Keep the generator ready to start.

  • Visual inspection, leaks and general condition
  • Oil, coolant and fuel levels
  • Batteries, terminals and charger
  • Water drained from the fuel
  • Test run with operating readings
  • Controller alarm review
  • Entry in the equipment history
LEVEL 2

Preventive maintenance

Every 250 h or 6 months

Everything in level 1, plus:

  • Oil and oil filter change
  • Fuel and air filters (per restriction indicator)
  • Belts, hoses and clamps
  • Coolant concentration and radiator cleaning
  • Battery capacity test
  • Transfer switch test simulating an outage
LEVEL 3

Annual comprehensive

Once a year

Everything in level 2, plus:

  • Load bank test
  • Alternator insulation resistance (megger) test
  • Thermography of connections and switchgear
  • Safety shutdown tests
  • Voltage regulator and excitation
  • Controller configuration backup
  • Laboratory oil analysis (optional)

Corrective and emergency service

Generators that will not start, will not produce voltage, shut down or show alarms. Diagnosis with the controller software, repair and parts replacement, with a report of the cause and the fix. Contract customers get priority response.

Report a failure
MORE THAN MAINTENANCE

We go beyond the oil change

A generator is part of a system: the transfer switch that hands it the load, the controller that runs it and the failures that leave a trace. We take on the whole system.

Automatic transfer switches (ATS)

The generator starts, but the load does not transfer or does not return to the grid. We check the whole switchgear and leave it tested.

  • Switchgear maintenance: contactors or breakers, interlocks and terminals
  • Timer settings: start, transfer, retransfer and cool-down
  • Simulated grid outage test, with and without load
  • Transfer controller replacement or upgrade
Transfer and synchronizing →

Failure and root cause analysis

When a failure keeps coming back, replacing the part is not enough. We find out why it happened, with evidence, so it does not happen again.

  • Controller event and alarm history
  • On-site measurements: voltage, current, insulation and thermography
  • Root cause methodology: 5 whys and fishbone diagram
  • Report with cause, evidence and corrective actions
Request an analysis →

Software diagnostics

We connect to the controller and the engine with each manufacturer’s software to see what the display does not show.

  • Fault codes, event history and live data
  • Configuration backup, adjustment and cloning
  • Inputs, outputs, sequences and protection
  • Voltage regulator and engine parameters
DeepSea · DSE Configuration SuiteComAp · InteliConfigDEIF · Utility SoftwareCaterpillar® · Cat® ETCummins · InPower
Request a diagnosis →
ANNUAL CONTRACT

One calendar, nothing forgotten

The most cost-effective way to keep your generator ready: we schedule the whole year, remind you before every visit and give you priority for corrective work. Here is an example for a standby generator:

JanI
FebI
MarP
AprI
MayI
JunI
JulI
AugI
SepA
OctI
NovI
DecI
IOperational inspectionPPreventiveAAnnual comprehensive

Prime-power generators (camps, job sites, off-grid areas) are scheduled by running hours.

PROTOCOL

What we check, and how often

This is our base protocol. We adapt it to your equipment manual and include it in writing in the proposal.

Engine and lubrication
TaskMonthlyPreventiveAnnual
Oil level and condition, leaks
Oil and oil filter change
Belts, pulleys and tensioners
Mounts, exhaust and muffler
Laboratory oil analysis (optional)
LOAD TESTING

Running a generator unloaded is not testing it

A generator that is only started with no load can “pass” the test and still fail in a blackout. With a resistive load bank we run it in steps (for example 25%, 50% and 75%) while recording voltage, frequency, pressure and temperature. This proves it delivers its rated power and burns off accumulated deposits.

25%
Start-up and stability
50%
Voltage and frequency regulation
75%
Temperature and sustained power
WHAT YOU GET

Every visit is documented

  • Technical report

    Photos, operating readings, findings and the condition of each system, in PDF.

  • Equipment history

    Maintenance log, hours, parts and failures, ready for audits and inspections.

  • Prioritized recommendations

    What needs attention now, what can wait and what it costs, with no surprises.

  • Service tag on the unit

    Date of this service and the next one, visible on the generator.

  • Maintenance certificate

    Supporting record for management, insurers, audits and regulators.

JAC Engineering
MAINTENANCE REPORTIllustrative example
150 kVA generator set · Standby
Hour meter1,284 hNormal
Voltage L-L220 VNormal
Frequency60.0 HzNormal
Oil pressure52 psiNormal
Temperature84 °CNormal
Batteries23.9 VCheck
Recommendation: replace batteries (4 years in service).
SELF-CHECK

Is your generator ready? Find out in 30 seconds

Answer honestly. Nothing is stored: the result is calculated on your screen.

Has it run under load in the last month?

Were the oil and filters changed in the last 6 months?

Are the batteries less than 3 years old?

Was the transfer switch tested with a simulated outage in the last 6 months?

Is there a written maintenance record?

Is the controller free of active alarms?

HOW WE WORK

From the first visit to the annual schedule

  1. Diagnostic visitWe check the condition of the generator, nameplate, hours, transfer switch and surroundings, and tell you what we found.
  2. Tailored proposalPlan and frequencies based on how the generator is used and the manufacturer’s manual, with scope and price in writing.
  3. Scheduled visitsTime windows agreed with you so operations are not affected, with lockout/tagout safety procedures.
  4. Report and follow-upA report for every visit, alerts on open items and a reminder before the next service.
HOW WE DO IT

Safety, order and technical backing

Safe work

Lockout/tagout, personal protective equipment and a risk assessment before any intervention.

Proper waste handling

Used oil, filters and batteries go to a licensed waste handler.

Quality parts

Genuine filters, oils and batteries, or certified equivalents, depending on the brand.

Priority with a contract

Preferential response for corrective work for annual-plan customers.

BRANDS

We work with all brands

Experience with the engines and controllers most used in Colombia, in open or soundproof generators, standby or prime power, and with each one’s configuration and diagnostic software.

Engines

PerkinsCumminsCaterpillar®Volvo PentaDoosanand other brands

Controllers

DeepSeaComApDEIFCat® EMCPCummins PowerCommandSmartGen

Brands belong to their manufacturers. JAC Engineering provides independent services and is not an official dealer of any of them.

REFERENCES

Recognized good practice

Manufacturer’s manual

Intervals, parts and settings for each engine and generator.

NTC 2050 · Section 700 (based on the NEC)

Emergency systems must be tested periodically, with a written record of tests and maintenance.

NFPA 110

International standard for emergency and standby power systems: inspections, monthly exercise under load and annual load bank testing.

RETIE

Colombia’s technical regulation for electrical installations, applied to all electrical work.

QUOTE

Tell us about your generator and we will send you a proposal

Fill in what you know. Sending opens WhatsApp (or your email) with the message ready; nothing is stored on the site.

FAQ

What customers usually ask

What is a root cause analysis and when do I need one?

It is a structured investigation of why a failure happened: we review the controller history, measure on site and analyze the evidence until we reach the underlying cause, not just the symptom. We recommend it when a failure keeps recurring, when the damage was costly or when you need a formal report for management, the insurer or an inspector.

Do you also service the transfer switch?

Yes. We maintain, adjust and test automatic transfer switches (ATS), and replace or upgrade their controller when needed. A generator in perfect condition is useless if the transfer switch does not hand it the load.

How often does a generator need maintenance?

An operational inspection every month, a preventive service with oil and filter change every 250 hours or 6 months (whichever comes first, or as the manufacturer specifies), and a comprehensive service with a load test once a year. Prime-power generators are scheduled by running hours.

Do we need to cut the building’s power?

Not for inspections or preventive maintenance: the generator is serviced while the grid keeps feeding the load. The transfer switch test does involve a brief, controlled interruption, scheduled with you at the least disruptive time.

How long does a visit take?

An operational inspection takes about an hour per generator; a preventive service, two to four hours depending on size and access. Load bank testing is scheduled separately.

Do you handle emergencies?

Yes. We handle corrective work with on-site diagnosis, and annual-contract customers get priority. Response time is agreed in the contract depending on the city.

Are parts included?

Your choice: the contract can include preventive consumables (oil, filters, coolant) or we quote them at each visit. Repairs are quoted separately after diagnosis.

Is the report valid for audits or the board?

Yes. Every visit leaves a technical report with photos and readings, plus the equipment history. It is the record property managers, auditors, insurers and inspectors ask for.